Calgary Warehouse Site Selection
A structured method for choosing a Calgary warehouse location — geography, building spec, land use, freight access and cost — with the publi…
Run this before you sign. Items marked PR can be checked on the public record from this site before you ever visit; the rest need the building, the landlord or a professional.
Have the lease reviewed by a commercial real estate lawyer. Have any building condition question you cannot answer answered by a qualified consultant. And keep a written record of every representation made during the tour — if it matters, it belongs in the lease, not in an email.
This is a checklist, not adviceIt is a starting framework for your own diligence. It is not legal, engineering, environmental or accounting advice, and no item on it substitutes for a qualified professional on a specific building.
Work through site access and yard, building specification (clear height, docks, slab, roof, sprinkler), services capacity, regulatory fit with the land-use district, and the full lease and cost package including additional rent history and restoration obligations.
Land-use designation, published parcel area, recorded construction year, up to 22 years of assessment history, connected building permit and development application records, and distance to published truck routes.
A structured method for choosing a Calgary warehouse location — geography, building spec, land use, freight access and cost — with the publi…
What goes into additional rent (operating costs, TMI) on a Calgary industrial lease, which components move, how to audit them, and the claus…
How to read The City of Calgary's building permit and development application records on an industrial property — what the statuses mean, wh…
The public record narrows the field. Finding what is actually available, at what terms, is direct work.
Submit a requirementBrowse the record